Atnaujintas knygų su minimaliais defektais pasiūlymas! Naršykite ČIA >>

BEST SCHEDULING APPROACH FOR PASSENGER TERMINAL BUILDING PROJECT: A CASE STUDY

-15% su kodu: ENG15
84,28 
Įprasta kaina: 99,15 
-15% su kodu: ENG15
Kupono kodas: ENG15
Akcija baigiasi: 2025-03-03
-15% su kodu: ENG15
84,28 
Įprasta kaina: 99,15 
-15% su kodu: ENG15
Kupono kodas: ENG15
Akcija baigiasi: 2025-03-03
-15% su kodu: ENG15
2025-02-28 99.1500 InStock
Nemokamas pristatymas į paštomatus per 11-15 darbo dienų užsakymams nuo 10,00 

Knygos aprašymas

The book in the area of project management schedule a case study for passenger terminal building project at pune, India. In the Project Management, schedule is usually utilized in the project planning and project portfolio management parts of project management. Elements on a schedule could also be closely associated with the work breakdown structure (WBS) terminal elements, the Statement of labor, or a Contract Data Requirements List. This book help identify and manage the Construction schedules activities with necessary to finish each task. The schedule maker should have a piece breakdown structure (WBS), an attempt estimate for every task, and a resource list with availability for every resource. The reason for this is often that a schedule itself is an estimate: each date within the schedule is estimated, and if those dates don't have the buy-in of the people who are going to do the work, the schedule will be inaccurate. The Proper planning and scheduling are needed to ensure that a construction project is completed on time and within budget. A well-planned construction schedule not only helps in outlining the pace of work but also how the work will be done.

Informacija

Autorius: P. R. Kalyana Chakravarthy, R. Pugazhenthi,
Leidėjas: LAP LAMBERT Academic Publishing
Išleidimo metai: 2022
Knygos puslapių skaičius: 152
ISBN-10: 6204982451
ISBN-13: 9786204982458
Formatas: 220 x 150 x 10 mm. Knyga minkštu viršeliu
Kalba: Anglų

Pirkėjų atsiliepimai

Parašykite atsiliepimą apie „BEST SCHEDULING APPROACH FOR PASSENGER TERMINAL BUILDING PROJECT: A CASE STUDY“

Būtina įvertinti prekę

Goodreads reviews for „BEST SCHEDULING APPROACH FOR PASSENGER TERMINAL BUILDING PROJECT: A CASE STUDY“