Atnaujintas knygų su minimaliais defektais pasiūlymas! Naršykite ČIA >>

Analysis of Construction Project Delays and Cost overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan as Case Study

-15% su kodu: ENG15
73,29 
Įprasta kaina: 86,22 
-15% su kodu: ENG15
Kupono kodas: ENG15
Akcija baigiasi: 2025-03-03
-15% su kodu: ENG15
73,29 
Įprasta kaina: 86,22 
-15% su kodu: ENG15
Kupono kodas: ENG15
Akcija baigiasi: 2025-03-03
-15% su kodu: ENG15
2025-02-28 86.2200 InStock
Nemokamas pristatymas į paštomatus per 11-15 darbo dienų užsakymams nuo 10,00 

Knygos aprašymas

The books takes a holistic picture of construction projects delays and cost overruns by examining real projects. The major causes of project delays and cost overruns have been identified on the basis of questionnaire survey from the major stakeholders, including contractors, designers, sponsors and project managers. The analysis has revealed that cost increases, time delays and poor quality are three major concerns in the construction projects of Higher Education Sector of Pakistan. In the economic analysis, the delayed part of the projects has been analyzed on the basis of actual costs from the real time cost data. The Construction Price Index has been calculated on the basis of increases in the costs of delayed items of work. The book is recommended for the graduate students of Construction and Project management. It is also useful for the undergraduate students to develop their perceptions about the project management. For the students in Pakistan, the book can provide valuable information about the factors leading to project delays and cost overruns of construction projects

Informacija

Autorius: Attaullah Shah
Leidėjas: Scholars' Press
Išleidimo metai: 2014
Knygos puslapių skaičius: 120
ISBN-10: 3639713273
ISBN-13: 9783639713275
Formatas: 220 x 150 x 8 mm. Knyga minkštu viršeliu
Kalba: Anglų

Pirkėjų atsiliepimai

Parašykite atsiliepimą apie „Analysis of Construction Project Delays and Cost overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan as Case Study“

Būtina įvertinti prekę

Goodreads reviews for „Analysis of Construction Project Delays and Cost overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan as Case Study“