Sim Jia Zheng

Rasta: 2
Construction Productivity in the Multilayer Subcontracting System: The Case of Singapore
-15% su kodu: ENG15
143,97 
169,38 
Išsiųsime per 11-15 d. d.
Construction Productivity in the Multilayer Subcontracting System: The Case of Singapore
-15% su kodu: ENG15
143,97 
169,38 
Išsiųsime per 11-15 d. d.
Rasta: 2